work site three star hydro power( sapsu small hydro power plant)
location – khotang
33KV VCB Maintenance
-
Maintenance of Vacuum Circuit Breakers (VCBs):
-
2 Nos. 33kV Outdoor VCBs:
Thorough inspection, testing, and maintenance of two outdoor 33kV vacuum circuit breakers, including cleaning, contact resistance checking, lubrication, and tightening of terminals to ensure reliable performance. -
1 No. Indoor VCB:
Performed internal checks, insulation testing, mechanical operation testing, and general servicing to restore full functionality of the indoor unit.
-
-
Battery Charging System Troubleshooting:
-
Diagnosed and resolved issues related to the plant’s battery charging unit.
-
Ensured proper voltage regulation, charging current, and battery health to support emergency backup systems.
-
-
Governor System Repair:
-
Identified and resolved faults in the hydro turbine governor system, ensuring precise speed regulation and load control.
-
Recalibrated and tested governor settings to improve system responsiveness and stability.
-
-
Solenoid Valve Problem Resolution:
-
Troubleshot and repaired faulty solenoid valves affecting hydraulic and control systems.
-
Ensured correct actuation and valve performance for critical operations.
-
Re-installation ( sapsu hydro power plant)
all system setup and installed
![]()
Keshu Multi Concern has established itself as a trailblazer in the realm of hydroelectric power installation, embodying innovation, sustainability, and efficiency in every project undertaken. With a steadfast commitment to harnessing the potential of water resources for clean energy production, Keshu Multi Concern has carved out a distinguished reputation in the energy sector.


Three Star Hydro Power Plant – Sapsu Khola
Capacity: 6.6 MW
Location: Sapsu Khola, Nepal
Project Overview
The Three Star Hydro Power Plant at Sapsu Khola is a 6.6 MW hydroelectric facility situated in Nepal. This plant represents a significant addition to the region’s renewable energy infrastructure, aimed at providing a sustainable and reliable source of electricity.
Maintenance
With installation complete, the plant is now in its operational phase, which involves ongoing maintenance to ensure efficient and reliable performance:
Regular Inspections: The plant undergoes routine inspections to monitor the condition of critical components, including turbines, generators, and control systems.


RE-INSTALLATION
Turbines and Generators: The Re-installation of the hydro turbines and generators was carried out according to precise engineering specifications. These components were carefully re-installed and integrated into the plant’s infrastructure.
Preventive Measures: Preventive maintenance activities, such as lubrication, cleaning, and minor adjustments, are performed to prevent potential issues and extend the lifespan of equipment.
Electrical Systems: Electrical components, including transformers, control panels, and grid connection systems, were installed to ensure the plant’s integration with the national grid.
System Testing: Comprehensive testing of the installed equipment and systems was conducted to ensure proper functionality and performance. This included load testing and performance validation.
Commissioning: The plant was officially commissioned following successful testing and regulatory approvals, marking the transition from construction to operational status.